• TR939.jpg

Triangle TR939

●  Reinforced bead construction ●  Special belt construction ●  High cut resistancecompound adaptation


Feature


●  Super anti-cut patterndesign with stone ejectors

Offers ultra tread cut prevention

 

●  High cut resistancecompound adaptation

Prevent tread damage undersevere operation

 

●  Special belt construction

Offers extra protection

 

●  Reinforced bead construction

Offers higher load capabilityunder short distance, slow speed,severe mining condition

Parameter


Size LI/SS PR Rim size

Rim

allowance

Inflated

Section width

(mm)

Overall

diameter

(mm)

Radius

under load

(mm)

Load capacity kg/lbs IP

OTD

(mm)

Single Dual kpa Psi
11.00R20 150/147D 16 8 8.5,8.00V 293 1096 499 3350/7390 3075/6780 830 120 24
11.00R20 152/149D 18 8 8.5,8.00V 293 1096 499 3550/7830 3250/7160 930 135 24
12.00R20 154/151D 18 8.5 8.50V,9.0 315 1136 516 3750/8270 3450/7610 830 120 26
12.00R20 156/153D 20 8.5 8.50V,9.0 315 1136 516 4000/8820 3650/8050 900 131 26
12.00R20 158/155D 22 8.5 8.50V,9.0 315 1136 516 4250/9370 3875/8540 970 141 26

Previous Page


Keyword:

Triangle TR939

Production


strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong

Corporate Video


video
Close

Corporate Video 5

video
Close

Corporate Video 4

video
Close

Corporate Video 3

video
Close

Corporate Video 2

Cooperative partner


FAQ


Do you inspect all your goods before delivery?

Yes, we have 100% inspection before delivery.

What is your sample policy?

We can supply the sample if available, but the customer have to pay the sample and shipping cost.

Can you produce according to the samples?

Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

How about your delivery time?

Generally, it will take 15 to 30 days after receiving your advance payment.

What is your terms of delivery?

EXW, FOB, CFR, CIF, DDU.

What is your terms of payment?

T/T 30% as deposit, and 70% before delivery.

What is your packing method?

Generally, no package or as per customer's requirement.

Message consultation


We will surprise you with a gift as soon as we receive your message.