• TR929.jpg

Triangle TR929

●  High cut resistancecompound adaptation ●  Special belt construction ●  Reinforced bead construction


Feature


●  Super big open shoulderlug pattern design withstone ejectors

Offers excellent traction andheat dispersion and stonecut prevention

 

●  High cut resistancecompound adaptation

Prevent tread damage undersevere operation

 

●  Special belt construction

Offers extra protection

 

●  Reinforced bead construction

Offers higher load capability

under short distance, slow speed,severe road condition

Parameter


Size LI/SS PR Rim size

Rim

allowance

Inflated

Section width

(mm)

Overall

diameter

(mm)

Radius under

load

(mm)

Load capacity kg/lbs IP

OTD

 

mm

Single Dual kpa Psi
7.00R16LT 118/114F 14 5.50F 6.00G 200 785 362 1320/2910 1180/2600 770 112 14
7.50R16LT 122/118F 14 6.00G 5.50F,6.50H 215 815 375 1500/3305 1320/2910 770 112 17
8.25R16LT 128/124F 16 6.50H 6.00G 6.5 235 865 397 1800/3970 1600/3525 770 112 17
9.00R20 141/139F 14 7 7.00T,7.5 259 1030 471 2575/5675 2430/5355 790 115 23.5
9.00R20 144/142F 16 7 7.00T,7.5 259 1030 471 2800/6175 2650/5840 900 130 23.5
10.00R20 146/143F 16 7.5 7.50V,8.0 278 1065 486 3000/6610 2725/6005 830 120 24
10.00R20 149/146F 18 7.5 7.50V,8.0 278 1065 486 3250/7160 3000/6610 930 135 24
11.00R20 150/147F 16 8 8.5,8.00V 293 1096 499 3350/7390 3075/6780 830 120 24
11.00R20 152/149F 18 8 8.5,8.00V 293 1096 499 3550/7830 3250/7160 930 135 24
12.00R20 154/151F 18 8.5 8.50V,9.0 315 1136 516 3750/8270 3450/7610 830 120 25
12.00R20 154/151F 18 8.5 8.50V,9.0 315 1136 516 3750/8270 3450/7610 830 120 25
12.00R20 156/153F 20 8.5 8.50V,9.0 315 1136 516 4000/8820 3650/8050 900 131 25
12.00R20 156/153F 20 8.5 8.50V,9.0 315 1136 516 4000/8820 3650/8050 900 131 25
12.00R20 158/155F 22 8.5 8.50V,9.0 315 1136 516 4250/9370 3875/8540 970 141 25
12.00R20 158/155F 22 8.5 8.50V,9.0 315 1136 516 4250/9370 3875/8540 970 141 25

Previous Page


Keyword:

Triangle TR929

Production


strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong

Corporate Video


video
Close

Corporate Video 5

video
Close

Corporate Video 4

video
Close

Corporate Video 3

video
Close

Corporate Video 2

Cooperative partner


FAQ


Do you inspect all your goods before delivery?

Yes, we have 100% inspection before delivery.

What is your sample policy?

We can supply the sample if available, but the customer have to pay the sample and shipping cost.

Can you produce according to the samples?

Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

How about your delivery time?

Generally, it will take 15 to 30 days after receiving your advance payment.

What is your terms of delivery?

EXW, FOB, CFR, CIF, DDU.

What is your terms of payment?

T/T 30% as deposit, and 70% before delivery.

What is your packing method?

Generally, no package or as per customer's requirement.

Message consultation


We will surprise you with a gift as soon as we receive your message.