TERRAKKING AR588
Classification:
● Mixed pavement, unpaved pavement.
Contact:
Feature
Pattern characteristic:
● Super skeleton material super ring structure, nylon reinforcement layer and shoulder imageoptimization.Integrate technology to improve heavy load capacity.The falling horizontal ditchadopts stones, and thelongitudinal ditch is strengthened to prevent the damage of stones to thedit ch bottom.The use of special ultra-low heat generation and tear resistance formula can inhibitheat accumulation and lead to early void under heavy load conditions,It has excellent low anti cutting block performance when used on poor roads
Suitable conditions:
● Mixed pavement, unpaved pavement.
Parameter
SIZE | PR |
STANDARD RIM |
LOAD INDEX & SPEED RATING |
OUTER DIAMETER (mm) |
SECTION WIDTH (mm) |
MAX LOAD(KG) SINGLE/DUAL |
MAX PRESSURE (KPA) |
12.00R20 | 20 | 8.50 | 156/153K | 1126 | 310 | 4000/3650 | 900 |
Previous Page
Next Page
Keyword:
TERRAKKING AR588
Production
Corporate Video

Corporate Video 5

Corporate Video 4

Corporate Video 3

Corporate Video 2
Cooperative partner
FAQ
Do you inspect all your goods before delivery?
Yes, we have 100% inspection before delivery.
What is your sample policy?
We can supply the sample if available, but the customer have to pay the sample and shipping cost.
Can you produce according to the samples?
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
How about your delivery time?
Generally, it will take 15 to 30 days after receiving your advance payment.
What is your terms of delivery?
EXW, FOB, CFR, CIF, DDU.
What is your terms of payment?
T/T 30% as deposit, and 70% before delivery.
What is your packing method?
Generally, no package or as per customer's requirement.
Related Products
Message consultation
We will surprise you with a gift as soon as we receive your message.