Triangle TR690
Classification:
● Special tread compound ● Lug pattern design withstraight sub-grooves ● Open and wide groovesdesign with stone ejector
Contact:
Feature
● Special tread compound
Suitable for paved-mixroad condition
Excellent mileage
● Lug pattern design withstraight sub-grooves
Good traction underpaved-mixed operation
Good handling and control
● Open and wide groovesdesign with stone ejector
Reduced heat accumulation andprevents stone pinching
Good mileage and groove bottomcut resistance
Parameter
Size | Brand Activities |
Inflated Section width (mm) |
Overall diameter (mm) |
Radius under load (mm) |
Load capacity kg/lbs | IP |
OTD (mm) |
|||||
LI/SS | PR | Rim size |
Rim allowance |
Single | Dual | kpa | Psi | |||||
7.50R15TR | 136/134J | 18 | 6.00 | 5.50,6.50 | 215 | 808 | 372 | 2240/4940 | 2120/4675 | 830 | 120 | 14.0 |
7.00R16LT | 107/102K | 8 | 5.50F | 6.00G | 200 | 785 | 362 | 975/2150 | 850/1875 | 460 | 67 | 12.5 |
7.00R16LT | 111/107K | 10 | 5.50F | 6.00G | 200 | 775 | 362 | 1090/2405 | 975/2150 | 560 | 80 | 12.5 |
7.00R16LT | 118/114K | 14 | 5.50F | 6.00G | 200 | 775 | 362 | 1320/2910 | 1180/2600 | 770 | 112 | 12.5 |
7.50R16LT | 105/101K | 6 | 6.00G | 5.50F,6.50H | 215 | 805 | 375 | 925/2040 | 825/1820 | 350 | 50 | 14.0 |
7.50R16LT | 112/107K | 8 | 6.00G | 5.50F,6.50H | 215 | 805 | 375 | 1120/2470 | 975/2150 | 460 | 65 | 14.0 |
7.50R16LT | 122/118K | 14 | 6.00G | 5.50F,6.50H | 215 | 805 | 375 | 1500/3305 | 1320/2910 | 770 | 110 | 14.0 |
8.25R16LT | 110/105K | 6 | 6.50H | 6.00G 6.50 | 235 | 865 | 397 | 1060/2335 | 925/2040 | 320 | 45 | 13.0 |
8.25R16LT | 126/112K | 14 | 6.50H | 6.00G 6.50 | 235 | 865 | 397 | 1700/3750 | 1500/3305 | 170 | 97 | 13.0 |
8.25R16LT | 128/124K | 16 | 6.50H | 6.00G 6.50 | 235 | 855 | 397 | 1800/3970 | 1600/3525 | 770 | 112 | 13.0 |
9.00R20 | 141/139K | 14 | 7.00 | 7.00T,7.50 | 259 | 1019 | 471 | 2575/5675 | 2430/5355 | 790 | 115 | 15.5 |
9.00R20 | 144/142K | 16 | 7.00 | 7.00T,7.50 | 259 | 1019 | 471 | 2800/6175 | 2650/5840 | 900 | 130 | 15.5 |
10.00R20 | 146/143K | 16 | 7.50 | 7.50V,8.00 | 278 | 1054 | 486 | 3000/6610 | 2725/6005 | 830 | 120 | 16.5 |
10.00R20 | 149/146K | 18 | 7.50 | 7.50V,8.00 | 278 | 1054 | 486 | 3250/7160 | 3000/6610 | 930 | 135 | 16.5 |
11.00R20 | 150/147K | 16 | 8.00 | 8.50,8.00V | 293 | 1085 | 499 | 3350/7390 | 3075/6780 | 830 | 120 | 17.5 |
11.00R20 | 152/149K | 18 | 8.00 | 8.50,8.00V | 293 | 1085 | 499 | 3550/7830 | 3250/7160 | 930 | 135 | 17.5 |
12.00R20 | 152/149K | 16 | 8.50 | 8.50V,9.00 | 315 | 1125 | 516 | 3550/7830 | 3250/7160 | 760 | 110 | 18.5 |
12.00R20 | 154/151K | 18 | 8.50 | 8.50V,9.00 | 315 | 1125 | 516 | 3750/8270 | 3450/7610 | 830 | 120 | 18.5 |
12.00R20 | 156/153G | 20 | 8.50 | 8.50V,9.00 | 315 | 1125 | 516 | 4000/8820 | 3650/8050 | 900 | 131 | 18.5 |
12.00R20 | 158/155F | 22 | 8.50 | 8.50V,9.00 | 315 | 1125 | 516 | 4250/9370 | 3875/8540 | 970 | 141 | 18.5 |
11R22.5 | 144/142M | 14 | 8.25 | 7.50 | 279 | 1054 | 491 | 2800/6175 | 2650/5840 | 720 | 105 | 22.5 |
11R22.5 | 146/143M | 16 | 8.25 | 7.50 | 279 | 1054 | 491 | 3000/6610 | 2725/6005 | 830 | 120 | 22.5 |
Previous Page
Next Page
Keyword:
Triangle TR690
Production
Corporate Video

Corporate Video 5

Corporate Video 4

Corporate Video 3

Corporate Video 2
Cooperative partner
FAQ
Do you inspect all your goods before delivery?
Yes, we have 100% inspection before delivery.
What is your sample policy?
We can supply the sample if available, but the customer have to pay the sample and shipping cost.
Can you produce according to the samples?
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
How about your delivery time?
Generally, it will take 15 to 30 days after receiving your advance payment.
What is your terms of delivery?
EXW, FOB, CFR, CIF, DDU.
What is your terms of payment?
T/T 30% as deposit, and 70% before delivery.
What is your packing method?
Generally, no package or as per customer's requirement.
Related Products
Message consultation
We will surprise you with a gift as soon as we receive your message.