• O1CN01ubuWRY1OHwoLAd7cm_!!2218721091681-0-cib (1) (1) (1) (1) (1) (1) (1).jpg

YARTU CR926

●  Ultra wear-resistant and durable ●  Wide adaptability to road conditions ●  Safe and comfortable ●  A pioneer in fuel efficiency, wear resistance and cost savings


Feature


●  Ultra wear-resistant and durable

Optimize the distribution of crown and shoulder materials, with super durability and no shoulder gaps in the middle and later stages.

Optimize the crown arc and the contour design of the tire body, with an excellent grounding shape, effectively reducing eccentric wear.

●  Wide adaptability to road conditions
Anti pinch stone main groove design increases the external thrust of stones in the groove, making it easier to discharge.

●  Safe and comfortable

High-density mesh water-breaking dislocation steel sheets and the addition of functional resins on the tread effectively puncture the water ,improve wet grip, and be safer.

●  A pioneer in fuel efficiency, wear resistance and cost savings

SSS contour optimization technology optimizes contour and structural parameters to make the product ground contact uniform and more wear-resistant while effectively reducing rolling resistance.

Parameter


 

Specification

Ply Rating

(PR)

Load Index(kg)

Speed Rating (kg)

Tread Depth

(mm)

Standard Rim
6.50R16 12 110/105L 9.5 5.50F
7.00R16 14 118/114M 11.0 5.50F
7.50R16 14 122/118L 12.0 6.00G
8.25R16 14 126/122L 14.0 6.50H
16 128/124L 14.0 6.50H
9.00R16 14 131/126L 15.0 6.50H
7.50R20 14 130/128L 14.0 6.0
8.25R20 14 136/134K 15.0 6.5
16 139/137L 15.0 6.5
9.00R20 14 141/139K 15.0 7.0
16 144/142K 15.0 7.0
10.00R20 16 146/143K 16.0 7.5
18 149/146J 16.0 7.5
11.00R20 16 150/147K 16.0 8.0
18 152/149K 16.0 8.0
12.00R20 18 154/151k 17.5 8.5
20 156/153J 17.5 8.5
11R22.5 16 148/145M 15.5 8.25
12R22.5 16 150/147L 16.0 9.00
18 152/149L 16.0 9.00
13R22.5 18 154/151K 16.0 9.75

 


Keyword:

YARTU CR926

Production


strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong
strong

Corporate Video


video
Close

Corporate Video 5

video
Close

Corporate Video 4

video
Close

Corporate Video 3

video
Close

Corporate Video 2

Cooperative partner


FAQ


Do you inspect all your goods before delivery?

Yes, we have 100% inspection before delivery.

What is your sample policy?

We can supply the sample if available, but the customer have to pay the sample and shipping cost.

Can you produce according to the samples?

Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

How about your delivery time?

Generally, it will take 15 to 30 days after receiving your advance payment.

What is your terms of delivery?

EXW, FOB, CFR, CIF, DDU.

What is your terms of payment?

T/T 30% as deposit, and 70% before delivery.

What is your packing method?

Generally, no package or as per customer's requirement.

Message consultation


We will surprise you with a gift as soon as we receive your message.