GITI 225v1
Classification:
● Lighter and stronger carcass skeleton material and crown material for lower weight and less energy loss.
Contact:
Feature
● The addition of multi-terminal modified polybutadiene new low rolling resistance tread formula has lower tread heat generation and reduced energy loss.
● The second-generation tire RR prediction technology is used to optimize the thickness of the tread compound and reduce energy loss.
● Incorporating synthetic rubber with high styrene content and high slip resistance silica to provide excellent wet grip.
● The strong tread block design and the main groove gradient groove depth design greatly improve the overall rigidity of the tire shoulder, provide faster drive response, stronger grip, and more sensitive steering.
● The 4-band pattern block variable pitch design reduces the sharpness of the pattern hitting the road surface and reduces the instantaneous impact noise.
Size Range
| TYRE SIZE | LOAD INDEX&SPEED CLASS | MAXIMUM RATED AIR PRESSURE KPA | SUITABLE MODELS |
| 265/40 R22 | 106V | 340 | BYD Tang DM 2020 |
| 245/45 R20 | 103V | 340 | 2020 BYD Tang,2019 WEY VV5,etc |
| 235/50 R19 | 99V | 300 | BYD Song Plus 2021,FAW-Volkswagen Qianyue 2019 |
| 215/50 R18 | 96V | 340 | Euler Good Cat 2021,Volkswagen T-ROC 2019 |
| 225/45 R18 | 95V | 340 | BAIC EU72019,JACiEVS42019 |
| 225/55 R18 | 102H | 300 | 2020 Vehram EX5,2018 Dongfeng Peugeot 4008 |
| 225/50 R18 | 95V | 300 | BYD Seal 2022 |
| 245/50 R18 | 100V | 300 | 2020 BYD Han,2017 InfinitiQ70 |
| 205/55 R16 | 91V | 300 | Changan CS15 EV 2020,Bora 2020 |
Keyword:
GITI 225v1
Related Products
Production
Corporate Video
Corporate Video 5
Corporate Video 4
Corporate Video 3
Corporate Video 2
Cooperative partner
FAQ
Do you inspect all your goods before delivery?
Yes, we have 100% inspection before delivery.
What is your sample policy?
We can supply the sample if available, but the customer have to pay the sample and shipping cost.
Can you produce according to the samples?
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
How about your delivery time?
Generally, it will take 15 to 30 days after receiving your advance payment.
What is your terms of delivery?
EXW, FOB, CFR, CIF, DDU.
What is your terms of payment?
T/T 30% as deposit, and 70% before delivery.
What is your packing method?
Generally, no package or as per customer's requirement.
Message consultation
We will surprise you with a gift as soon as we receive your message.