CHAOYANG AD528
Classification:
Five ribs with four wide, straight grooves for precise handling and outstanding traction
Contact:
Feature
Benefits and Features
-
Designed to provide exceptional Performance and Life in Line haul Drive applications
-
Shoulder reinforcement design, Enhance durability of use
-
Special designed tread grooves reduce stone retention for extended tyre life

Parameter
| Size | LR/PR | Service index |
Tread Depth (mm) |
Standard Rim |
Overall Diameter (mm) |
Section Width (mm) |
Max. Load Capacity at Cold Inflation Pressure | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Single | Dual | |||||||||||||
| (kg) | (lbs) | (kPa) | (psi) | (kg) | (lbs) | (kPa) | (psi) | |||||||
| 275/80R22.5 | H/16 | 149/146M | 18.0 | 8.25 | 1012 | 276 | 3250 | 7165 | 850 | 123 | 3000 | 6610 | 850 | 123 |
| 295/80R22.5 | J/18 | 152/149M | 18.0 | 9.00 | 1050 | 298 | 3550 | 7830 | 900 | 131 | 3250 | 7160 | 900 | 131 |
*Reserves the rights of final interpretation and modification;
Previous Page
Next Page
Keyword:
CHAOYANG AD528
Production
Corporate Video
Corporate Video 5
Corporate Video 4
Corporate Video 3
Corporate Video 2
Cooperative partner
FAQ
Do you inspect all your goods before delivery?
Yes, we have 100% inspection before delivery.
What is your sample policy?
We can supply the sample if available, but the customer have to pay the sample and shipping cost.
Can you produce according to the samples?
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
How about your delivery time?
Generally, it will take 15 to 30 days after receiving your advance payment.
What is your terms of delivery?
EXW, FOB, CFR, CIF, DDU.
What is your terms of payment?
T/T 30% as deposit, and 70% before delivery.
What is your packing method?
Generally, no package or as per customer's requirement.
Related Products
Message consultation
We will surprise you with a gift as soon as we receive your message.