Orelas Mining Flower Tires 20.5/70 23.5-25 16/70-20
Classification:
● Low Heat Generation ● Tire Tread Explosion-proof ● Strong Load Bearing & Anti-scratch
Contact:
Feature
● Low Heat Generation
Strong and flexible molecular chain rubber to reduce heat generation by 30%
New functional resin to improve the bonding ability of carbon black and rubber molecules
● Tire Tread Explosion-proof
Unique new steel belt structure
Application of belt steel wire with high-elongation & high-strength
● Strong Load Bearing & Anti-scratch
Reinforced tire body & strengthen tire structure for heavy load
Thickened sidewall protection rib & optimized tire profile to prevent scratching
Anti-Cut and Chip compound developed for mixed conditions of working in the mine and delivers materials out of mine services.
Parameter
Specification | Ply Rating | Standard Rim |
Groove Depth (mm) |
Overall Diameter (mm) |
Section Width (mm) |
MAX Load Capacity(kg) | MAX Pressure (kPa) | TT/TL | Pattern Code | ||
10Km/h | 50Km/h | 10Km/h | 50Km/h | ||||||||
26.5-25 | 32PR | 22.00/3.0 | 35 | 1750 | 675 | 17000 | 11200 | 550 | 425 | TT/TL | E-3/L-3 |
23.5-25 | 20PR | 19.50/2.5 | 35 | 1615 | 595 | 10000 | 7300 | 375 | 300 | TT/TL | E-3/L-3 |
23.5-25 | 24PR | 19.50/2.5 | 35 | 1615 | 595 | 12500 | 8000 | 475 | 350 | TT/TL | E-3/L-3 |
20.5-25 | 20PR | 17.00/2.0 | 28 | 1615 | 595 | 9500 | 6000 | 450 | 325 | TT/TL | E-3/L-3 |
17.5-25 | 20PR | 14.00/1.5 | 26 | 1350 | 445 | 8250 | 5000 | 575 | 400 | TT/TL E-3/L-3 | |
20.5/70-16 | 14PR | 10.00E | 19 | 950 | 365 | / | 1600 | / | 390 | TT E-3/L-3 |
Previous Page
Next Page
Keyword:
Orelas Mining Flower Tires 20.5/70 23.5-25 16/70-20
Production
Corporate Video

Corporate Video 5

Corporate Video 4

Corporate Video 3

Corporate Video 2
Cooperative partner
FAQ
Do you inspect all your goods before delivery?
Yes, we have 100% inspection before delivery.
What is your sample policy?
We can supply the sample if available, but the customer have to pay the sample and shipping cost.
Can you produce according to the samples?
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
How about your delivery time?
Generally, it will take 15 to 30 days after receiving your advance payment.
What is your terms of delivery?
EXW, FOB, CFR, CIF, DDU.
What is your terms of payment?
T/T 30% as deposit, and 70% before delivery.
What is your packing method?
Generally, no package or as per customer's requirement.
Related Products
Message consultation
We will surprise you with a gift as soon as we receive your message.